Project: Duvall Field

Location

9119 Rhode Island Avenue

ABOUT THE PROJECT

This 7-acre park was first established in the 1960’s.  Almost 20 years ago, a comprehensive renovation plan was prepared but implementation was deferred due to lack of funding.  A new concession/restroom building and recreation plaza were completed in 2018 (Phase 1).  A new plan for the remaining park facilities is needed, and GreenPlay, LLC was retained to work with the community to determine the features and amenities to be included in the park.  A visioning report and preliminary conceptual plan were completed in May 2019.  In the fall of 2019, an Environmental Science and Policy class at the University of Maryland completed a study of options for sports field playing surfaces and a decision guide to assist the City with determining what type of turf to use.  Phase 2 of this project is the design and construction of the remainder of the park, which is now underway.

Status

Contract for park design awarded by City Council to KCI Technologies on October 27, 2020.  Design plans 60% complete and under review by staff.  Community meeting scheduled for July 26 and City Council review schduled for September 6, 2022.

Funding

Anticipated Total Project Cost for design and construction of Phase 2 is $5,829,168 available in the Capital Improvement Program using Capital Project reserves, Program Open Space and State Bond Bills.

Visioning and Planning cost: $29,999

Phase 1 design and construction cost:  $1,200,000. 

Estimated Completion date

Phase 2 design is estimated to be completed summer 2022 and construction by spring 2023.


  1. DuvallFieldPlaza
  2. DuvallField

Project Documents

  • Duvall Field Fact Sheet
  • Duvall Field Visioning Public Engagement Summary
  • Conceptual Plan
  • Final Visioning Study Report by GreenPlay, LLC
  • Summary of Athletic Field Options Environmental Science & Policy Capstone Project presented to the Mayor and Council Tuesday, December 3, 2019. - PowerPoint
  • Final Report
  • Design RFP CP-21-03
    Addendum 1
    Attachment 1: List of Attendees
    Attachment 2: As-built Concession  drawings
    Attachment 3: Conceptual Plan presentation drawing
    Addendum 2 - Geotechnical Report 
  • RFP Bid Opening Results
  • Duvall Field Park Design Community Meeting
    June 2021 Presentation Slides
  • Duvall Field Park Design Community Meeting
    June 2021 Recording
  • Duvall Field Park Preliminary Preferred Concept Plan
  • Duvall Field Park Design Community Meeting July 26, 2022
    •  Video of the meeting
    • PowerPoint slides

Contacts

Project Manager, Terry Schum, Planning Director

Department of Planning and Community Development

Phone: 240-487-3538



Media Inquiries

City Communications

Events

Duvall Field Park Design Community Meeting
Tuesday, July 26, 2022 at 7:00 p.m. Click here for flyer.


Homepage
Notify me
facebook
Twitter
Insgram
  1. City Hall
    7401 Baltimore Avenue
    College Park, MD 20740
    Departments & Hours

  2. Phone:
    240.487.3500
Site Map
Report a Problem
Privacy & Accessibility
Careers
Webmaster
Employee Login
  1. City Departments
  2. City Governance
  3. Guides to College Park
  4. Calendar
  5. Events
  6. News
  7. COVID-19 Updates & ARPA Assistance
  8. Maps
  9. Places
  10. Projects
  11. About the City
  12. Store
  13. Pay & Apply
  14. Alerts & Notices
  15. Report
Arrow Left Arrow Right
[]
Slideshow Left Arrow Slideshow Right Arrow